The Product · SV-1
Sovereign-1

A sovereign data center,
in a 40-foot box.

SV-1 is the Rhodium 45 modular AI compute container. One megawatt of dedicated, liquid-cooled GPU capacity — deployed behind the perimeter your regulator requires, site-ready to go-live in twelve weeks.

Sovereign-1 (SV-1) modular AI compute container sited on a prepared pad at dusk, with fiber and power tie-ins

UNIT: SV-11 MW · 8 RACKS · LIQUID-COOLED
Specifications

One unit. One megawatt. One jurisdiction.

SV-1 is the atomic unit of the Rhodium 45 network. Every deployment — single-site or multi-country — composes from it.

Form factor
40 ft modular container, ISO frame
Power envelope
1 MW per unit, behind-the-meter compatible
Compute density
8 liquid-cooled racks · H200 & B200-class
Reference capacity
Up to 1,024 H200-class accelerators
Cooling
Direct-to-chip liquid, closed-loop
Network
Dual-path fiber, in-country peering
Key custody
Customer-controlled HSM, optional air-gap
Site-ready to go-live
12 weeks from prepared pad
What SV-1 Does

Four capabilities that hyperscale racks cannot offer.

01

Sited where the data must stay

SV-1 deploys onto a prepared pad inside the jurisdiction your regulator names. No cross-border egress by architectural default.

02

Behind-the-meter ready

Operates on stranded gas, sovereign-allocated grid power, or in-fence industrial supply. Bypasses 4–7 year grid interconnect queues.

03

Single-tenant by default

Dedicated capacity per customer. No shared inference plane, no multi-tenant control surface, no third-party data egress.

04

Regulator-facing interfaces

Audit, residency attestation and key-custody interfaces designed for the regulator to use directly — not the operator’s word for it.

H200-class GPU accelerator board inside an SV-1 rack

Inside SV-1

H200 & B200-class accelerators.
Single-tenant. In-country.

Deployment

Twelve weeks. Pad to production.

Conventional sovereign data centers take 24–36 months and a grid interconnect queue. SV-1 ships as a factory-commissioned unit and lands on a prepared pad. The timeline below is the standard engagement — measured from a signed contract and a surveyed site.

01WEEKS 1–3

Site Survey

Power, fiber, structural, jurisdictional review. Pad spec and tie-in plan finalised with your engineering team.

02WEEKS 3–7

Pad & Tie-Ins

Foundation cast, fiber and power brought to the perimeter. Behind-the-meter source commissioned where applicable.

03WEEKS 7–10

Container Drop-In

SV-1 arrives factory-commissioned. Crane-set, hard-tied, sealed. HSM key ceremony performed with customer custody.

04WEEKS 10–12

Burn-In & Go-Live

Full thermal load test, network proving, residency attestation. First production inference traffic served on week 12.

Indicative timeline. Behind-the-meter power sites, contested jurisdictions, and customer-specific compliance regimes can extend or compress individual phases. We commit a binding schedule at contract signature.

Deploy SV-1

Tell us the jurisdiction. We’ll tell you the timeline.